Files

73 lines
3.3 KiB
Markdown

---
name: miaobao-issue-acceptance-closeout
description: Complete a Miaobao issue or PR acceptance closeout when CI is green, a PR is ready to merge, or bookkeeping remains; includes local verification, Gitea/Drone truth, Feishu Base reconciliation, explicit confirmation, read-back, and cleanup.
---
# Miaobao Issue Acceptance Closeout
Use this when a Miaobao issue fix has reached PR/CI/merge-closeout state and the missing work is bookkeeping, verification, or cleanup.
Do not use this for initial debugging or feature implementation.
## Inputs / Context
1. Confirm the target issue, PR, worktree, and branch.
2. Check whether the task belongs to:
- requirements pool table `tblvIEDIu5WDWbn9`
- dev-task table `tblSbtRSb6L6EaPB`
3. Check the current truth surfaces:
- local verification output
- Gitea PR state
- linked issue state
- Drone build state
- existing Feishu/Base record or absence of one
4. Verify whether `lark-cli` is callable; on this Mac it may live at `/Users/zfc/.npm-global/bin/lark-cli`.
## Procedure
1. Reconfirm the local result before touching bookkeeping.
- Prefer exact focused tests plus the repo's normal gate: `typecheck`, `lint`, `format:check`, build/test as appropriate.
2. Reconfirm remote state.
- Check latest PR head, Drone result, mergeability, and whether the linked issue is already closed.
3. Find the Feishu/Base row before writing anything.
- Use `+record-search` by issue number, title, or PR number.
4. Prepare the record draft and show it to the user before writing.
- Keep identifier columns simple:
- `Gitea工单`: bare digits like `1631`
- `PR` or `PR编号`: bare digits like `1731`
- Put links, CI evidence, and notes in narrative fields such as `备注` or `验收标准`.
5. After explicit confirmation, write with `lark-cli`.
6. Read the record back and verify the exact written state.
7. Clean the local acceptance environment only after the record is verified.
- Worktree removal
- Local branch cleanup if appropriate
- Port cleanup
- Screenshot/temp artifact cleanup if they were acceptance-only
## Efficiency
1. Route by issue/PR number first; avoid broad repo scans.
2. Reuse one authoritative Base/table/view target instead of guessing from older links.
3. Prefer one final reconciliation pass:
- local evidence
- PR/issue state
- Feishu record-search
- cleanup
4. Stop once all of these agree; do not keep rechecking unrelated browser/UI state.
## Pitfalls
- If the PR is merged but the task still is not actually done, check Feishu/Base update and read-back before closeout.
- If Feishu fields look noisy or sort badly, keep ID fields as bare digits and move narrative evidence elsewhere.
- If browser login looks wrong, do not assume Feishu is inaccessible; test the actual `lark-cli` path and cached identity directly.
- If CI says `Build was killed` or a long test step fails without code evidence, inspect step-level Drone state before changing product code.
## Verification Checklist
- Local verification outputs exist and match the task scope.
- Latest Drone/build state is green or the exact non-code blocker is documented.
- PR state is correct and linked issue state is correct.
- Feishu/Base record exists or was created intentionally.
- Written record was read back and matches the intended status.
- Local acceptance worktree/env cleanup is complete.